Case Studies

A127 Rayleigh
Case Study
Highways & Local Authorities

A127 Rayleigh

  Two operatives installed 70 metres of Durakerb in just 2 hours and 15 minutes during a scheme on the…
A550 Welsh Road
Case Study
Highways & Local Authorities

A550 Welsh Road

The A550 Welsh Road at Woodbank, near Chester, links the M53 motorway with North Wales and carries a steady mix…
Suffolk County Council
Case Study
Highways & Local Authorities

Suffolk County Council

Following the successful completion three schemes in Clare and Worlingworth and Sapiston, Suffolk County Council’s site teams had one question…
N5 Ireland
Case Study
Highways & Local Authorities

N5 Ireland

  Client: Transport Infrastructure Ireland (TII), in partnership with Mayo County Council Main contractor: Willis/BAM JV Design consultants: RPS Group…
M1 Bricket Wood
Case Study
Highways & Local Authorities

M1 Bricket Wood

  A routine technology upgrade at Junction 6 of the M1 in Bricket Wood became an opportunity to reduce carbon…
Station Road, Burton – Cheshire
Case Study
Highways & Local Authorities

Station Road, Burton – Cheshire

  More than twenty years ago, Station Road in Burton, Cheshire became the site of the very first Durakerb installation.…
Redbridge Council
Case Study
Highways & Local Authorities

Redbridge Council

As part of its commitment to sustainability, Redbridge Council has become the first London borough to incorporate a range of low carbon materials and…
Histon Road
Case Study
Highways & Local Authorities

Histon Road

The Greater Cambridge Partnership’s Histon Road improvement scheme has transformed one of Cambridge’s busiest areas into a safer, more sustainable…
Milton Road – Durakerb and Duradrain
Case Study
Highways & Local Authorities

Milton Road – Durakerb and Duradrain

The Greater Cambridge Partnership’s Milton Road improvement scheme has transformed one of Cambridge’s key transport corridors into a safer and…
Glen Park Road – Wirral
Case Study
Highways & Local Authorities

Glen Park Road – Wirral

Glen Park Road, Wallasey, Wirral is a busy residential street with limited off-road parking. Residents and visitors regularly park partially…
McDonald’s Market Drayton
Case Study
Retail, Leisure & Hospitality

McDonald’s Market Drayton

In 2021, McDonald’s set out an ambitious goal to deliver its first net-zero carbon restaurant in the UK and Ireland…
Moycullen Bypass
Case Study
Highways & Local Authorities

Moycullen Bypass

As major road upgrades continue to improve connectivity across Ireland, effective drainage remains a critical part of long-term performance and…
Mount Lucas Training Campus
Case Study
Education, Healthcare & Community

Mount Lucas Training Campus

Mount Lucas Training Centre, Ireland’s National Construction Training Campus in County Offaly, recently upgraded its access roads and pedestrian areas.…
Everton Football Club – Bramley Moore Dock Stadium
Case Study
Retail, Leisure & Hospitality

Everton Football Club – Bramley Moore Dock Stadium

Leading sustainable construction innovator, Duraproducts, has announced the successful installation of its recycled and recyclable lightweight linear drainage channel, Durachannel,…
The sustainable kerbing choice for Sancler Property
Case Study
Residential Development

The sustainable kerbing choice for Sancler Property

Award-winning Welsh property developer, Sancler Property has reflected on its ongoing five-year partnership with Duraproducts, the sustainable construction solution manufacturer.…
Spinnaker House Extra Care
Case Study
Residential Development

Spinnaker House Extra Care

For the new Spinnaker House Extra Care development, Duradrain – Duraproducts’ recycled, lightweight combined kerb and drainage solution that effectively…
Durachannel follows in the foosteps
Case Study
Water, Utilities & Climate Resilience

Durachannel follows in the foosteps

Innovation should be an ongoing and ever improving cycle nurtured by governments, companies, regulation and the industry as a whole,…
Skilts School – Birmingham
Case Study
Education, Healthcare & Community

Skilts School – Birmingham

When the Skilts School relocated from Redditch to a purpose built new school in Birmingham the contractor, Balfour Beatty, decided…
Expansion into Europe
Case Study
Highways & Local Authorities

Expansion into Europe

Having worked with our partners IDS (www.ids-group.nl) for over two years, the interest created in Belgium, Holland and Denmark has…
Middleton School – County Cork
Case Study
Education, Healthcare & Community

Middleton School – County Cork

ABM Europe design and construct responsibly to produce buildings of integrity. Midleton School was the one of many designed and…
Auckley – Doncaster Highways
Case Study
Highways & Local Authorities

Auckley – Doncaster Highways

Managing risk is a key performance measure for Doncaster Highways and a process applied consistently from initial design and operations…
Histon Road Cycleway – Cambridge
Case Study
Transport & EV Infrastructure

Histon Road Cycleway – Cambridge

We are delighted to have been involved in this project which we feel serves as a true example of innovation…
Costa Rotherham
Case Study
Retail, Leisure & Hospitality

Costa Rotherham

Just off the M1 near Rotherham is this small project where Duradrain was used to drain the car park and…
Aeropark Developments
Case Study
Commercial & Industrial Development

Aeropark Developments

Durakerb use has now exceeded 400,000 units thanks to companies such as Aeropark Developments Ltd. The WYG Farm Housing Project…
Cumbria Highways
Case Study
Highways & Local Authorities

Cumbria Highways

Cumbria County Council have been using Durakerb within their highway networks for over 10 years. The county has an extensive…
Dundee EV Charging Hub
Case Study
Transport & EV Infrastructure

Dundee EV Charging Hub

These projects are a great example of change in action. Lightweight and recycled Durakerb has been designed and installed around…
Truro – Park & Ride
Case Study
Transport & EV Infrastructure

Truro – Park & Ride

In 2015 Cornwall Council and the Duchy of Cornwall collaborated to add a second Truro Park and Ride site, this…
A191 Silverlink
Case Study
Highways & Local Authorities

A191 Silverlink

Installed in sections in 2017 and early 2018, Durakerb has been used along the kerb lines which transition through areas…